The Wiltern Theater
Project Details
- LOCATION: Sacramento, California
- CLIENT: Clark Construction
- ARCHITECT: NBBJ
- COMPLETED: 2023
- Timeline: 2 Weeks
- CONTRACT AMOUNT:$45.9M
Bear Flag SCOPE: Metal Framing, Gypsum Sheathing, Fire & Smoke Assembly, Thermal Insulation, DEFS, Weather Barriers, Applied Fireproofing, Fire-Resistive Joint Systems, Gypsum Board Shaft Wall Assemblies, Non-Structural Metal Framing, Special Plaster Finish, Gypsum Board, Acoustic Insulation
Project Story
New Sacramento Courthouse is a 567,000-square-foot, 18-story building, with 53 courtrooms and offices, mechanical penthouse, and 71-car basement garage.
The new tower was built to consolidate the functions of the Gordon D. Schaber Courthouse and three other satellite facilities for the county. It conforms to a full city block.
The state-of-the-art facility, built to LEED Gold standards, is clad with precast concrete panels, curtain-wall glass, and has areas decorated with a randomized vertical-panel screen.